Posts tagged ‘Macquarie Primary School’

We were beyond proud to be one of 14 shortlisted projects in the global Service Design Network Awards 2017 for our work with Macquarie Primary School: Design In Schools. We’re even prouder when we won.

SDN said:

We are delighted to announce this year’s Service Design Award 2017 Finalists selected by our international jury of Service Design experts. These shortlisted projects are internationally recognised as benchmarks of world class Service Design. Congratulations to the nine Professionals and five Students for their fantastic work and the contribution they have made to the field of Service Design.

It was great to meet our fellow finalists and designers and share the experiences of outstanding service design projects and achievements.

Our trip to Madrid with our Macquarie partners, Wendy Cave and Sophie Mendick, (our dedicated Teacher Partner, Faith Bentley, the brilliant 18 little designers, and Executive teacher Brendan Briggs will be there in more than spirit) in November for Service Design Global Conference SDGC17 for our nominated category: professional, non-profit / public sector was capped off with our winners presentation on Day 2.

 

 

For a history of the work see our previous posts:

 

Leave a comment

carparklaunch

As a service designer you, funnily enough, design! You make sure there’s an intent, you understand the needs of your sponsor, stakeholders, users, you confirm your parameters and constraints and you use prototyping, iteration and testing to make your very best guess at what will work. You document it all in a compelling evidence-based story called a Design Specification and you hope you’ve done something to instill a design mindset in the multi-disciplinary team you collaborated with. And then usually (however increasingly not for us but more on that later), you leave the business to it to do the work of implementing the solutions.

For our DesignInSchools project with Macquarie Primary School – taking a group of 10 and 11 year-olds through a formal design process on a real problem – we didn’t really just leave the business to it because implementation and then evaluation are critical subsequent steps to design actually making the difference you intended.

Principal Wendy Cave, as sponsor, champion, point-of-pain-sufferer and driver (literally and metaphorically) would keep us in the loop of all the conversations and negotiations she was having with Police, Road representatives, Education Directorates, all the while being driven herself by the team of students in the IMM (Implementation Managers Macquarie).

And this week we were so proud to rejoin our colleagues, team-mates and friends at Macquarie Primary School to launch the implemented design that our team of Year 10-11 students and their teacher Faith Bentley developed.

All of the elements of the design have been implemented, and in a couple of cases, beneficially extended:

  • Solution 1: Representation and Reality – A map showing functional zones, layout and peak/off-peak usage guidance has been developed and made available electronically to all users.
  • Solution 2: Sign Zones – Road markings have been updated, zones clarified, and layout adjusted to aid functionality of all users (i.e parents/carers, students, staff, walkers, drop-off/pick-up users, visitors). Accompanying signs are mix of instructional messages and friendly-toned guidance.
  • Solution 3: VIPs (Very Important Presence) – the physical presence of people in the car park at peak times on a volunteer basis is now fully rostered. The School calls them ‘Vesties’ and “they are invested in creating a positive car park user experience”.
  • Solution 4: Speedbreaker – a concrete speedhump has been installed at the entrance to focus the drivers attention as early as possible on the mixed use environment they are moving into.
  • Solution 5: The Great Divide – a designated ‘safety zone’ that is enacted by use of cones and Vesties at the peak 15 mins in the morning and afternoon. The divide effectively splits the road in half and ‘forces’ drop-off/pick-up behaviour (not park and stay in a drop-off zone). The impact on the flow in peak times is remarkable.

vestiesmedley

With anecdotal reports of “a completely different experience for all now” in the carpark this project – this experience – has been outstanding.

 

See also:

ribboncut

3 Comments